The Rabigh 4 IWP Project with a capacity of 600,000 m3/ day.
SWRO desalination plant and the PWSF tank 1,200,000 m3 and the PV capacity of 6.804 MWp, and the location is next to our existing Rabigh 3 IWP Plant.
The project is consortium of ACWA Power owned 45%, Haji Ali Reza (HAACO) 35% and Al Moayyed 20%, and is scheduled to be commissioned by 31 March 2026.
Al Habtoor Tower Project
Al Habtoor Tower Project
We provided 1000 tons of plates.
Dubai’s tallest and most cutting-edge residential tower. This 82-story skyscraper is home to the most luxurious apartments, making it the pinnacle of luxury living in the area.
Located in the heart of Al Habtoor City, right off the famous Sheik Zayed Road, it is surrounded by some of the finest shopping, dining, and entertainment venues in all of Dubai. This beautiful tower is equipped throughout with ultra-luxurious living spaces that provide occupants the pinnacle of luxury and comfort.
Dubai Exhibition Centre Expansion Project
Dubai Exhibition Centre Expansion Project
We provided 4,700 tons of profiles.
The DEC master plan outlines the venue’s expansion in three key phases to accommodate the increasing demand for large-scale venues. In Phase 1, set for completion by 2026, the Dubai Exhibition Centre will feature 140,000sqm of exhibition space, nearly two and a half times its current capacity of 58,000sqm.
Phase 2, expected to be completed by 2028, will expand the total exhibition space to nearly 160,000sqm, along with enhancements to supporting infrastructure, road networks, and dedicated multi-story parking.
The final phase, expected to be completed by 2031, will increase the total indoor exhibition space to 180,000sqm, featuring 26 halls on a single contiguous level that spans 1.2 kilometres. This will accommodate one mega event or up to 20 simultaneous smaller events.
The final phase will also include a 300+ key hotel, retail outlets, commercial offices, and an industrial kitchen for fully integrated operations.
Once all phases of expansion are complete, the DEC will be 1.5 times larger than the current Dubai International Convention and Exhibition Centre (DICEC) and enable Dubai to double the number of large-scale events hosted annually, increasing from approximately 300 today to over 600 by 2033.
Sharjah International Airport Expansion Project
Sharjah International Airport Expansion Project
We provided 300 tons of plates.
The Sharjah International Airport Expansion Project is a major infrastructure development aimed at significantly increasing the airport’s capacity to meet growing passenger demand. With an estimated budget of $400 million (AED 1.47 billion), the project is set to transform the airport into a key regional aviation hub by 2027.
Increase annual passenger capacity from 8 million (2018) to 20 million by 2027.
- Support Sharjah’s economic growth by boosting tourism, trade, and aviation connectivity. - Align with the UAE’s 2050 climate neutrality goals through sustainable design, including eco-friendly materials and carbon reduction initiatives.
Dubai Habtoor Crystal Apartment Project
Dubai Habtoor Crystal Apartment Project
We supplied 500 tons of steel plates and 500 tons of tubular sections/profiles
The Dubai Habtoor Crystal Apartment Project is a super-tall luxury residential tower located in Marina District , one of Dubai’s most prestigious neighborhoods. Developed by the Habtoor Group, a leading real estate conglomerate in the UAE, this project represents a fusion of cutting-edge engineering, sustainable design, and ultra-luxury living.
This project is distinct from the Habtoor Tower (345m, 84 floors)**, which is another mega-development by the same group . - The "reverse construction" method allows simultaneous work on above-ground and underground structures, significantly reducing project timelines .
Key Features & Specifications - Height:238 meters (super-tall structure) - Architectural Style: Modern high-rise with a sleek glass façade - Structural System:Steel-framed with reinforced concrete core (complies with American building codes) - Construction Method: Utilizes top-down (reverse) construction techniquesfor efficiency - Total Steel Usage:8,265 tons(fabricated in Dubai and Tianjin, China)
SIX SENSE
SIX SENSE
We provided 300 tons of plates.
Located on the largest man-made island in the world, boasting sandy shores and closeness to the mainland, Six Senses Residences The Palm, Dubai is situated on Palm Jumeirah's West Crescent. With its location being one of the most desirable areas for obtaining property in Dubai, residents and visitors are provided with unparalleled luxury living and plenty of closeby entertainment facilities. Residents will have easy access to the island's famous attractions such as Nakheel Mall with over 300 shops, restaurants, cinema, children's playroom and other entertainment activities, and The Pointe - the waterfront hub full of restaurants, cafes and shopping outlets.